Vidwan-ID : 495734



Dr Siva Prasad BNV

Assistant Professor (Grade-II)
Indian Institute of Technology BHU Varanasi

Publications

  • 174
    Projects

Google Scholar

Expertise

Mining and Mineral Processing

I have inter-disciplinary industry-research experience working for mining, civil, tunnelling, hydel, irrigation, energy and infrastructure sectors. Broad area of works include applied rock mechanics, numerical modelling, drilling and blasting for underground and surface excavations, instrumentation, design of underground space, supports, in-situ stress, geotechnical mapping, rock mass characterization. Worked for lead-zinc, gold, copper, iron ore, uranium, aluminium, iron-ore, and coal mining.

Personal Information

Dr Siva Prasad BNV

Male
Department of Mining Engineering Indian Institute of Technology (Banaras Hindu University)
Varanasi, Uttar Pradesh, India - 221005


Experience

  • Assistant Professor (Grade-II)

    Department of Mining Engineering

    Indian Institute of Technology BHU Varanasi

  • Scientist C

    Numerical Modelling; Geomechanics and Ground Control Department at National Institute of Rock Mechanics (NIRM)

    Geological Survey of India

  • Scientist B

    Numerical Modelling at National Institute of Rock Mechanics

    Geological Survey of India

  • Assistant Manager

    Mining Engineering & Rock Mechanics

    Hindustan Zinc Limited


Qualification

  • Ph.D

    Indian Institute of Technology (ISM) Dhanbad

  • Professional Course Work

    Indian Institute of Technology (ISM) Dhanbad

  • BTech

    National Institute of Technology, Rourkela


Membership In Professional Bodies

2023

International Society for Rock Mechanics

Individual

2022

The Institution of Engineers (India)

Member

2022

Mining Engineer’s Association of India

Life Member

2023

International Society for Rock Mechanics

Individual

2022

The Institution of Engineers (India)

Member

2022

Mining Engineer’s Association of India

Life Member

Read Less

Research Projects

Assessment of Granite Building Stone Quarry of Thomas O D at Re Survey Nos: 234/1 in Wayanad District

Funding Agency : Prime Technology Services

Mine and Dump Slope Stability Analysis for Lloyds Metals & Energy Ltd.

Funding Agency : Llyods Metals and Energies Limited

Scientific Study for Prediction of 3D Subsidence of 373.2 Ha of land (206.826 Ha Forest Land) of Tandsi Underground Mine

Funding Agency : Western Coalfields Limited

Read More

Assessment of Granite Building Stone Quarry of Thomas O D at Re Survey Nos: 234/1 in Wayanad District

Funding Agency : Prime Technology Services

Mine and Dump Slope Stability Analysis for Lloyds Metals & Energy Ltd.

Funding Agency : Llyods Metals and Energies Limited

Scientific Study for Prediction of 3D Subsidence of 373.2 Ha of land (206.826 Ha Forest Land) of Tandsi Underground Mine

Funding Agency : Western Coalfields Limited

Review and determination of alarming limits for surface subsidence through numerical modelling at Rajpura Dariba Mines

Funding Agency : Principal Investigator

Failure Analysis of CP-03A Stope and Evaluation of Extraction Sequence of Different Stopes in C-Block at Sindesar Khurd Mines

Funding Agency : Principal Investigator

Analysis of Instrumentation data and assistance in installation and monitoring of Instruments at C#3 Package of Punatsangchhu-II hydroelectric Project

Funding Agency : Completed

Determination of In-situ stress regimes at the Downstream surge gallery of Punatsangchhu-II Hydroelectric project

Funding Agency : Completed

3D Numerical Modelling Studies of Powerhouse Complex at Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Laboratory Geotechnical Investigations on Jointed Rock Samples from Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Development of Geotechnical Instrument Network for C#3 package of PHPA-II Hydroelectric Project

Funding Agency :

Audit of ground Control Management Plan of Zawar Group of Mines

Funding Agency :

Audit of ground Control Management Plan of Rampura Agucha Underground Mines

Funding Agency : Completed

Scientific studies to Design Geotechnical Instrumentation Plan at Rampura Agucha Underground Mines

Funding Agency : Completed

Design of ground Support Below -233 mRL upto -533mRL at Rampura Agucha Underground Mines

Funding Agency : Completed

Scientific Studies to Assess the stability of Drives through Paste fill Rampura Agucha Underground Mines

Funding Agency : Completed

Scientific Studies to Assess the feasibility of Underground mining methods at Rampura Agucha Underground Mines

Funding Agency : Completed

Stability Analysis of Butterfly Valve Chamber using 3D Numerical Models at Mangdhechu Hydroelectric Project

Funding Agency : Completed

3D Numerical Model Studies for Stress Analysis of Underground Powerhouse Complex and Underground Surge Shaft of Naitwar Mori Hydroelectric Project

Funding Agency : Completed

Analysis of instrumentation data and assistance in installation & Monitoring of Instrumentation at C-3 package of Punatsangchhu-II Hydroelectric Project Bhutan

Funding Agency :

Establishing the dimensions of caprock and estimating the stoping parameters for K Series and Northern series of lenses at North Baroi Mine

Funding Agency : Completed

Assessment of stability of the mine pertaining to extraction of an Ore block at Baroi Mine

Funding Agency : Completed

Scientific study to assess the stress and displacement limits at Zawar Mines

Funding Agency : Completed

Geotechnical instrumentation installation and monitoring at Kaleswaram Project-Package-11

Funding Agency : Completed

3D numerical modelling analysis for the pump house and surge pool caverns of Pranahita-Chevella Sujala Sravanthi Lift Irrigation Scheme Package-8

Funding Agency : Completed

Support design of underground surge pool and pump house by 3D Numerical Modelling of Pranahita-Chevella Sujala Sravanthi Lift Irrigation Scheme (PCSSLIS) Package-11

Funding Agency : Completed

Pit slope stability analysis of North East benches of A Narrain Mines

Funding Agency : Co-Principal Investigator

To carry out rock mechanics investigations

Funding Agency : Karnataka

To carry out rock mechanics investigations

Funding Agency : Karnataka

Numerical Modelling Studies for Optimisation of of Mining Parameters at Ambaji Underground Mine of GMDC Ltd. Gujarat

Funding Agency : Gujarat Mineral Development Corporation Ltd.

Numerical Modelling Studies for Optimisation of Mining Parameters at the Open Cast Mines (Kadipani fluorspar and Kadipani Expansion project) of GMDC Ltd. Gujarat

Funding Agency : Gujarat Mineral Development Corporation Ltd.

Design Review and Audit of Under Construction Railway Tunnels in Dimapur-Kohima Railway Line

Funding Agency : NorthEast Frontier Railway

Analysis of geotechnical and geodetic instrumentation data at C3 package of Punatsangchhu-II Hydroelectric Project (2023-2024)

Funding Agency : Punatsangchhu-II Hydroelectric Project Authority

3D numerical modelling studies of powerhouse complex for Lakhwar multipurpose project (300MW)

Funding Agency : Ongoing

Monitoring of permanent DGPS points established on spillway blocks 35

Funding Agency : Gujarat

Analysis of geotechnical and geodetic instrumentation data at C3 package of Punatsangchhu-II Hydroelectric Project (2022-2023)

Funding Agency : Punatsangchhu-II Hydroelectric Project Authority

Geodetic monitoring of Sardar Sarovar Dam

Funding Agency : Sardar Sarovar Narmada Nigam Ltd.

3D numerical modelling of Vishnugad Pipalkoti powerhouse complex _ Analysis with different geological and geotechnical parameters

Funding Agency : THDC India Ltd.

3D slope stability analysis of already excavated slopes of plunge pool area of Koldam HPP

Funding Agency : National Thermal Power Corporation (NTPC)

Deformation monitoring of underground riverbed powerhouse cavern of Sardar Sarovar Project

Funding Agency : Sardar Sarovar Narmada Nigam Ltd.

3D numerical modelling of underground powerhouse complex and surge shaft for Reoli Dugli Hydroelectric Project (456 MW)

Funding Agency : Sardar Sarovar Narmada Nigam Ltd.

Design Methodology - Railway Tunnels between Trivandrum and Kanyakumari

Funding Agency : Completed

Geotechnical Mapping and Numerical Modelling of Underground Workings at Malanjkhand Copper Project

Funding Agency : Ongoing

Geotechnical Mapping

Funding Agency : Hindustan Copper Ltd.

Analysis of Cavity Monitoring System Data for the Void above Downstream Surge Chamber at C-3 Package of PHPA-II

Funding Agency : Punatsangchhu-II Hydroelectric Project Authority

Establishment of Permanent DGPS Points on spillway blocks 35

Funding Agency : Sardar Sarovar Dam.

Stability analysis of crane beam rock ledge using 3D numerical modelling at Palamuru Ranga Reddy Lift Irrigation Scheme-1

Funding Agency : Megha Engineering & Infrastructures Ltd (MEIL)

Geodetic Monitoring of Sardar Sarovar Project for the Year 2021-2022

Funding Agency : Sardar Sarovar Narmada Nigam Ltd.

Analysis of Instrumentation Data and Guidance during Installation & Monitoring of Instruments in powerhouse complex (C-3 Package) of Punatsangchhu-II Hydroelectric Project

Funding Agency : Punatsangchhu-II Hydroelectric Project Authority

3D Numerical Modelling of Powerhouse Complex for Sunni Dam Hydroelectric Project (382 MW)

Funding Agency : Completed

Analysis of instrumentation data at Dam Complex

Funding Agency : Co-Project Investigator

CapRock Stability at Central Baroi Mine vis-a-vis Depillaring of Remnant Pillars _ A Critical Appraisal

Funding Agency : Hindustan Zinc Limited (Vedanta)

Analysis of Cavity Monitoring System Data for the Void above Downstream Surge Chamber at C-3 Package of Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Analysis of Geotechnical & Geodetic Instrumentation Data at C-3 Package of Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Analysis of Instrumentation Data at Dam Complex

Funding Agency : Co-Project Investigator

3D Numerical modelling of powerhouse complex & surge tank for Vishnugad Pipalkoti Hydroelectric project

Funding Agency : Completed

Analysis of instrumentation data and guidance for installation and monitoring of instruments at C#3 package of Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Networking and Analysis of Instrumentation Data at Dam Complex

Funding Agency : Project Investigator

Scientific Studies for Evaluation of Stope and Pillar Stability vis-

Funding Agency : Project Investigator

Review and determination of alarming limits for surface subsidence through numerical modelling at Rajpura Dariba Mines

Funding Agency : Project Investigator

Failure Analysis of CP-03A Stope and Evaluation of Extraction Sequence of Different Stopes in C-Block at Sindesar Khurd Mines

Funding Agency : Project Investigator

Analysis of Instrumentation data and assistance in installation and monitoring of Instruments at C#3 Package of Punatsangchhu-II hydroelectric Project

Funding Agency : Completed

Determination of In-situ stress regimes at the Downstream surge gallery of Punatsangchhu-II Hydroelectric project

Funding Agency : Completed

3D Numerical Modelling Studies of Powerhouse Complex at Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Laboratory Geotechnical Investigations on Jointed Rock Samples from Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Development of Geotechnical Instrument Network for C#3 package of PHPA-II Hydroelectric Project

Funding Agency : Punatsangchhu-II Hydroelectric Project Authority

Audit of ground Control Management Plan of Zawar Group of Mines

Funding Agency : Hindustan Zinc Limited (Vedanta)

Audit of ground Control Management Plan of Rampura Agucha Underground Mines

Funding Agency : Completed

Scientific studies to Design Geotechnical Instrumentation Plan at Rampura Agucha Underground Mines

Funding Agency : Completed

Design of ground Support Below -233 mRL upto -533mRL at Rampura Agucha Underground Mines

Funding Agency : Completed

Scientific Studies to Assess the stability of Drives through Paste fill Rampura Agucha Underground Mines

Funding Agency : Completed

Scientific Studies to Assess the feasibility of Underground mining methods at Rampura Agucha Underground Mines

Funding Agency : Completed

Stability Analysis of Butterfly Valve Chamber using 3D Numerical Models at Mangdhechu Hydroelectric Project

Funding Agency : Completed

3D Numerical Model Studies for Stress Analysis of Underground Powerhouse Complex and Underground Surge Shaft of Naitwar Mori Hydroelectric Project

Funding Agency : Completed

Analysis of instrumentation data and assistance in installation & Monitoring of Instrumentation at C-3 package of Punatsangchhu-II Hydroelectric Project Bhutan

Funding Agency : Punatsangchhu-II Hydroelectric Project Authority

Establishing the dimensions of caprock and estimating the stoping parameters for K Series and Northern series of lenses at North Baroi Mine

Funding Agency : Completed

Assessment of stability of the mine pertaining to extraction of an Ore block at Baroi Mine

Funding Agency : Completed

Scientific study to assess the stress and displacement limits at Zawar Mines

Funding Agency : Completed

Geotechnical instrumentation installation and monitoring at Kaleswaram Project-Package-11

Funding Agency : Completed

3D numerical modelling analysis for the pump house and surge pool caverns of Pranahita-Chevella Sujala Sravanthi Lift Irrigation Scheme Package-8

Funding Agency : Completed

Support design of underground surge pool and pump house by 3D Numerical Modelling of Pranahita-Chevella Sujala Sravanthi Lift Irrigation Scheme (PCSSLIS) Package-11

Funding Agency : Completed

Pit slope stability analysis of North East benches of A Narrain Mines

Funding Agency : Co-Project Investigator

To carry out rock mechanics investigations

Funding Agency : Karnataka

To carry out rock mechanics investigations

Funding Agency : Karnataka

Assessment of Granite Building Stone Quarry of Thomas O D at Re Survey Nos: 234/1

Funding Agency : Wayanad District

Mine and Dump Slope Stability Analysis for Lloyds Metals & Energy Ltd.

Funding Agency : Maharashtra

Scientific Study for Prediction of 3D Subsidence of 373.2 Ha of land (206.826 Ha Forest Land) of Tandsi Underground Mine

Funding Agency : Project Investigtor

Numerical Modelling Studies for Optimisation of of Mining Parameters at Ambaji Underground Mine of GMDC Ltd. Gujarat

Funding Agency :

Numerical Modelling Studies for Optimisation of Mining Parameters at the Open Cast Mines (Kadipani fluorspar and Kadipani Expansion project) of GMDC Ltd. Gujarat

Funding Agency :

Design Review and Audit of Under Construction Railway Tunnels in Dimapur-Kohima Railway Line

Funding Agency :

Analysis of geotechnical and geodetic instrumentation data at C3 package of Punatsangchhu-II Hydroelectric Project (2023-2024)

Funding Agency :

3D numerical modelling studies of powerhouse complex for Lakhwar multipurpose project (300MW)

Funding Agency : Ongoing

Monitoring of permanent DGPS points established on spillway blocks 35

Funding Agency : Gujarat

Analysis of geotechnical and geodetic instrumentation data at C3 package of Punatsangchhu-II Hydroelectric Project (2022-2023)

Funding Agency :

Geodetic monitoring of Sardar Sarovar Dam

Funding Agency :

3D numerical modelling of Vishnugad Pipalkoti powerhouse complex _ Analysis with different geological and geotechnical parameters

Funding Agency :

3D slope stability analysis of already excavated slopes of plunge pool area of Koldam HPP

Funding Agency :

Deformation monitoring of underground riverbed powerhouse cavern of Sardar Sarovar Project

Funding Agency :

3D numerical modelling of underground powerhouse complex and surge shaft for Reoli Dugli Hydroelectric Project (456 MW)

Funding Agency :

Design Methodology - Railway Tunnels between Trivandrum and Kanyakumari

Funding Agency : Completed

Geotechnical Mapping and Numerical Modelling of Underground Workings at Malanjkhand Copper Project

Funding Agency : Ongoing

Geotechnical Mapping

Funding Agency : Hindustan Copper Ltd.

Analysis of Cavity Monitoring System Data for the Void above Downstream Surge Chamber at C-3 Package of PHPA-II

Funding Agency :

Establishment of Permanent DGPS Points on spillway blocks 35

Funding Agency : Sardar Sarovar Dam.

Stability analysis of crane beam rock ledge using 3D numerical modelling at Palamuru Ranga Reddy Lift Irrigation Scheme-1

Funding Agency :

Geodetic Monitoring of Sardar Sarovar Project for the Year 2021-2022

Funding Agency :

Analysis of Instrumentation Data and Guidance during Installation & Monitoring of Instruments in powerhouse complex (C-3 Package) of Punatsangchhu-II Hydroelectric Project

Funding Agency :

3D Numerical Modelling of Powerhouse Complex for Sunni Dam Hydroelectric Project (382 MW)

Funding Agency : Completed

Analysis of instrumentation data at Dam Complex

Funding Agency : Co-Project Investigator

CapRock Stability at Central Baroi Mine vis-a-vis Depillaring of Remnant Pillars _ A Critical Appraisal

Funding Agency :

Analysis of Cavity Monitoring System Data for the Void above Downstream Surge Chamber at C-3 Package of Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Analysis of Geotechnical & Geodetic Instrumentation Data at C-3 Package of Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Analysis of Instrumentation Data at Dam Complex

Funding Agency : Co-Project Investigator

3D Numerical modelling of powerhouse complex & surge tank for Vishnugad Pipalkoti Hydroelectric project

Funding Agency : Completed

Analysis of instrumentation data and guidance for installation and monitoring of instruments at C#3 package of Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Networking and Analysis of Instrumentation Data at Dam Complex

Funding Agency : Project Investigator

Scientific Studies for Evaluation of Stope and Pillar Stability vis-

Funding Agency : Project Investigator

Review and determination of alarming limits for surface subsidence through numerical modelling at Rajpura Dariba Mines

Funding Agency : Project Investigator

Failure Analysis of CP-03A Stope and Evaluation of Extraction Sequence of Different Stopes in C-Block at Sindesar Khurd Mines

Funding Agency : Project Investigator

Analysis of Instrumentation data and assistance in installation and monitoring of Instruments at C#3 Package of Punatsangchhu-II hydroelectric Project

Funding Agency : Completed

Determination of In-situ stress regimes at the Downstream surge gallery of Punatsangchhu-II Hydroelectric project

Funding Agency : Completed

3D Numerical Modelling Studies of Powerhouse Complex at Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Laboratory Geotechnical Investigations on Jointed Rock Samples from Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Development of Geotechnical Instrument Network for C#3 package of PHPA-II Hydroelectric Project

Funding Agency :

Audit of ground Control Management Plan of Zawar Group of Mines

Funding Agency :

Audit of ground Control Management Plan of Rampura Agucha Underground Mines

Funding Agency : Completed

Scientific studies to Design Geotechnical Instrumentation Plan at Rampura Agucha Underground Mines

Funding Agency : Completed

Design of ground Support Below -233 mRL upto -533mRL at Rampura Agucha Underground Mines

Funding Agency : Completed

Scientific Studies to Assess the stability of Drives through Paste fill Rampura Agucha Underground Mines

Funding Agency : Completed

Scientific Studies to Assess the feasibility of Underground mining methods at Rampura Agucha Underground Mines

Funding Agency : Completed

Stability Analysis of Butterfly Valve Chamber using 3D Numerical Models at Mangdhechu Hydroelectric Project

Funding Agency : Completed

3D Numerical Model Studies for Stress Analysis of Underground Powerhouse Complex and Underground Surge Shaft of Naitwar Mori Hydroelectric Project

Funding Agency : Completed

Analysis of instrumentation data and assistance in installation & Monitoring of Instrumentation at C-3 package of Punatsangchhu-II Hydroelectric Project Bhutan

Funding Agency :

Establishing the dimensions of caprock and estimating the stoping parameters for K Series and Northern series of lenses at North Baroi Mine

Funding Agency : Completed

Assessment of stability of the mine pertaining to extraction of an Ore block at Baroi Mine

Funding Agency : Completed

Scientific study to assess the stress and displacement limits at Zawar Mines

Funding Agency : Completed

Geotechnical instrumentation installation and monitoring at Kaleswaram Project-Package-11

Funding Agency : Completed

3D numerical modelling analysis for the pump house and surge pool caverns of Pranahita-Chevella Sujala Sravanthi Lift Irrigation Scheme Package-8

Funding Agency : Completed

Support design of underground surge pool and pump house by 3D Numerical Modelling of Pranahita-Chevella Sujala Sravanthi Lift Irrigation Scheme (PCSSLIS) Package-11

Funding Agency : Completed

Pit slope stability analysis of North East benches of A Narrain Mines

Funding Agency : Co-Project Investigator

To carry out rock mechanics investigations

Funding Agency : Karnataka

To carry out rock mechanics investigations

Funding Agency : Karnataka

Assessment of Granite Building Stone Quarry of Thomas O D at Re Survey Nos: 234/1

Funding Agency : Wayanad District

Mine and Dump Slope Stability Analysis for Lloyds Metals & Energy Ltd.

Funding Agency : Maharashtra

Scientific Study for Prediction of 3D Subsidence of 373.2 Ha of land (206.826 Ha Forest Land) of Tandsi Underground Mine

Funding Agency : Principal Investigtor

Numerical Modelling Studies for Optimisation of of Mining Parameters at Ambaji Underground Mine of GMDC Ltd. Gujarat

Funding Agency :

Numerical Modelling Studies for Optimisation of Mining Parameters at the Open Cast Mines (Kadipani fluorspar and Kadipani Expansion project) of GMDC Ltd. Gujarat

Funding Agency :

Design Review and Audit of Under Construction Railway Tunnels in Dimapur-Kohima Railway Line

Funding Agency :

Analysis of geotechnical and geodetic instrumentation data at C3 package of Punatsangchhu-II Hydroelectric Project (2023-2024)

Funding Agency :

3D numerical modelling studies of powerhouse complex for Lakhwar multipurpose project (300MW)

Funding Agency : Ongoing

Monitoring of permanent DGPS points established on spillway blocks 35

Funding Agency : Gujarat

Analysis of geotechnical and geodetic instrumentation data at C3 package of Punatsangchhu-II Hydroelectric Project (2022-2023)

Funding Agency :

Geodetic monitoring of Sardar Sarovar Dam

Funding Agency :

3D numerical modelling of Vishnugad Pipalkoti powerhouse complex _ Analysis with different geological and geotechnical parameters

Funding Agency :

3D slope stability analysis of already excavated slopes of plunge pool area of Koldam HPP

Funding Agency :

Deformation monitoring of underground riverbed powerhouse cavern of Sardar Sarovar Project

Funding Agency :

3D numerical modelling of underground powerhouse complex and surge shaft for Reoli Dugli Hydroelectric Project (456 MW)

Funding Agency :

Design Methodology - Railway Tunnels between Trivandrum and Kanyakumari

Funding Agency : Completed

Geotechnical Mapping and Numerical Modelling of Underground Workings at Malanjkhand Copper Project

Funding Agency : Ongoing

Geotechnical Mapping

Funding Agency : Hindustan Copper Ltd.

Analysis of Cavity Monitoring System Data for the Void above Downstream Surge Chamber at C-3 Package of PHPA-II

Funding Agency :

Establishment of Permanent DGPS Points on spillway blocks 35

Funding Agency : Sardar Sarovar Dam.

Stability analysis of crane beam rock ledge using 3D numerical modelling at Palamuru Ranga Reddy Lift Irrigation Scheme-1

Funding Agency :

Geodetic Monitoring of Sardar Sarovar Project for the Year 2021-2022

Funding Agency :

Analysis of Instrumentation Data and Guidance during Installation & Monitoring of Instruments in powerhouse complex (C-3 Package) of Punatsangchhu-II Hydroelectric Project

Funding Agency :

3D Numerical Modelling of Powerhouse Complex for Sunni Dam Hydroelectric Project (382 MW)

Funding Agency : Completed

Analysis of instrumentation data at Dam Complex

Funding Agency : Co-Principal Investigator

CapRock Stability at Central Baroi Mine vis-a-vis Depillaring of Remnant Pillars _ A Critical Appraisal

Funding Agency :

Analysis of Cavity Monitoring System Data for the Void above Downstream Surge Chamber at C-3 Package of Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Analysis of Geotechnical & Geodetic Instrumentation Data at C-3 Package of Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Analysis of Instrumentation Data at Dam Complex

Funding Agency : Co-Principal Investigator

3D Numerical modelling of powerhouse complex & surge tank for Vishnugad Pipalkoti Hydroelectric project

Funding Agency : Completed

Analysis of instrumentation data and guidance for installation and monitoring of instruments at C#3 package of Punatsangchhu-II Hydroelectric Project

Funding Agency : Completed

Networking and Analysis of Instrumentation Data at Dam Complex

Funding Agency : Principal Investigator

Scientific Studies for Evaluation of Stope and Pillar Stability vis-

Funding Agency : Principal Investigator

Read Less